Submissions from 2004
THE INTERMITTENT BUS LANE SIGNALS SETTING WITHIN AN AREA, J Viegas and B Lu
Submissions from 2003
Public transport priority schemes: comparing microsimulation with traditional TRANSYT and LINSIG models, Sonal Ahuja, Tom van Vuren, Mott MacDonald, and Neil Priest
DATA CHALLENGES IN DEVELOPMENT OF A REGIONAL ASSIGNMENT: SIMULATION MODEL TO EVALUATE TRANSIT SIGNAL PRIORITY IN CHICAGO, E Chang and A Ziliaskopoulos
EVALUATION OF SERVICE RELIABILITY IMPACTS OF TRAFFIC SIGNAL PRIORITY STRATEGIES FOR BUS TRANSIT, James Chang, JJohn Collura, Francois Dion, and Hesham Rakha
FORECASTING TRAIN TRAVEL TIMES AT AT-GRADE CROSSINGS, Hanseon Cho and Laurence R. Rilett
EXTENSIONS AND NEW APPLICATIONS OF THE TRAFFIC-RESPONSIVE URBAN CONTROL STRATEGY: COORDINATED SIGNAL CONTROL FOR URBAN NETWORKS, C Diakaki, V DINOPOULOU, K Aboudolas, M Papageorgiou, E Ben-Shabat, E Seider, and A Leibov
MODELING THE CHOICE TO USE TOLL AND HIGH-OCCUPANCY VEHICLE FACILITIES, G D. Erhardt, F S. Koppelman, J Freedman, W A. Davidson, and A Mullins
Yield to Bus -- State of the Practice, R. D. King
CONVERTING A LARGE REGION TO A MULTIMODAL PULSED-HUB PUBLIC TRANSPORT NETWORK, R R. Maxwell
IMPLEMENTING ZURICH'S TRANSIT PRIORITY PROGRAM, Andrew Nash
LIFE-CYCLE GRAPHICAL REPRESENTATION OF MANAGED HIGH-OCCUPANCY VEHICLE LANE EVOLUTION, M Swisher, W L. Eisele, D Ungemah, and G D. Goodin
EFFECTS OF CHANGING OCCUPANCY REQUIREMENTS FOR HIGH-OCCUPANCY VEHICLE LANE: EL MONTE BUSWAY CASE STUDY, JULY 23, 2002, K F. Turnbull, J Obenberger, A CLARK, and D Helou
TRANSIT SIGNAL PRIORITY ALONG ARTERIALS USING ADVANCED DETECTION, Yann Wadjas and Peter G. Furth
Submissions from 2002
MODELING APPROACH FOR TRANSIT SIGNAL PREEMPTION, B B. Agrawal, S T. Waller, and A Ziliaskopoulos
Effectiveness of bus signal priority, S. Chada and R. Newland
A RULE-BASED REAL-TIME TRAFFIC RESPONSIVE SIGNAL CONTROL SYSTEM WITH TRANSIT PRIORITY: APPLICATION TO AN ISOLATED INTERSECTION, F Dion and B Hellinga
NEW INTELLIGENT TRANSPORT SYSTEMS APPLICATIONS IN EUROPE TO IMPROVE BUS SERVICES, N HOUNSELL and G Wall
BUS PRIORITY WITH HIGHLY INTERRUPTIBLE TRAFFIC SIGNAL CONTROL: SIMULATION OF SAN JUAN'S AVENIDA PONCE DE LEON, Melanie Janos and Peter G. Furth
SIMULATION OF HOUSTON LIGHT RAIL TRANSIT PREDICTIVE PRIORITY OPERATION, S M. Langdon
BENEFITS OF PILOT IMPLEMENTATION OF PUBLIC TRANSPORT SIGNAL PRIORITIES AND REAL-TIME PASSENGER INFORMATION, M LEHTONEN and R KULMALA
QUANTIFYING DELAY REDUCTION TO BUSES WITH SIGNAL PRIORITY TREATMENT IN MIXED-MODE OPERATION, W-H LIN
SAN DIEGO'S INTERSTATE 15 CONGESTION PRICING PROJECT: TRAFFIC-RELATED ISSUES, Janusz Supernak, Jacqueline Golob, Thomas F. Golob, Christine Kaschade, Camilla Kazimi, Eric Schreffler, and Duane Steffey
Submissions from 2001
STAKEHOLDER REQUIREMENTS FOR TRAFFIC SIGNAL PREEMPTION AND PRIORITY IN WASHINGTON, D.C., REGION, Jonathan Gifford, Danilo Pelletiere, and John Collura
COMPARISONS FROM SACRAMENTO MODEL TEST BED, John Douglas Hunt, Robert Johnston, John E. Abraham, Caroline J. Rodier, Gordon R. Garry, Stephen H. Putman, and Tomas de la Barra
Submissions from 2000
DEVELOPMENT AND EVALUATION OF INTELLIGENT BUS PRIORITY CONCEPT, K N. Balke, C L. Dudek, and Thomas Urbanik
Strategic public transport priority using selective vehicle detection - does it work?, K Fox, M Hallworth, B Collier, and S Jones
CONDITIONAL BUS PRIORITY AT SIGNALIZED INTERSECTIONS: BETTER SERVICE WITH LESS TRAFFIC DISRUPTION, Peter G. Furth and Theo H.J. Muller
IMPACT OF EMERGENCY VEHICLE PREEMPTION ON SIGNALIZED CORRIDOR OPERATION: AN EVALUATION, E J. Nelson and D Bullock
INTEGRATED TRANSPORTATION AND LAND USE POLICY ANALYSIS FOR SACRAMENTO, CALIFORNIA, S H. Putman, HZZ Ahmad, K-M Choi, W P. McCarthy, and Y Yan
SUCCESS FACTORS AND DECISION ISSUES FOR HIGH-OCCUPANCY VEHICLE FACILITIES, J L. Schofer and E J. Czepiel
CONTROL STRATEGIES FOR TRANSIT PRIORITY, A Skabardonis
Submissions from 1999
INCORPORATING TOLL-LANE AND HIGH-OCCUPANCY TOLL-LANE EFFECTS INTO THE DALLAS SYSTEM PLANNING METHODOLOGY, J C. Brunk and M D. Middleton
MUSIC PROJECT: URBAN TRAFFIC CONTROL FOR TRAFFIC DEMAND MANAGEMENT, R G. CLEGG and A J. Clune
OPTIMAL PRICING FOR PRIORITY SERVICE AND SPACE ALLOCATION IN CONTAINER PORTS, J Holguin-Veras and S Jara-Diaz
SAN DIEGO'S INTERSTATE 15 HIGH-OCCUPANCY/TOLL LANE FACILITY USING VALUE PRICING, L Hultgren and K KAWADA
LONDON'S NEW BUS "SUPER ROUTE", Institute of Transportation Engineers
ENHANCING TRANSIT IN TOURIST AREAS THROUGH IMPROVED MODELING AND PRIORITY INITIATIVES: CASE STUDY FROM AUSTRALIA, Dale Jepson, Damien Bitzios, and Luis Ferreira
SYNERGISMS AMONG LAND USE, TRANSIT, AND TRAVEL PRICING POLICIES, Robert A. Johnston and Caroline J. Rodier
HIGH-OCCUPANCY TOLL LANE SYSTEM: A CONCEPT PLAN FOR THE TWIN CITIES, A Z. Lari and K R. Buckeye
COMPONENTS OF TRAVEL TIME ON THE GLENDALE BEELINE BUS NETWORK, M Maloney and D Boyle
SUPERVISED INTERCONNECTION CIRCUITS AT HIGHWAY-RAIL GRADE CROSSINGS, D M. Mansel, V H. Waight, and J T. Sharkey
SUPERVISED INTERCONNECTION CIRCUITS AT HIGHWAY-RAIL GRADE CROSSINGS, D M. Mansel, V H. Waight, and J T. Sharkey
DEVELOPMENT OF HIERARCHICAL METHODOLOGY FOR BENEFIT EVALUATION OF VEHICLE-HIGHWAY AUTOMATION: CASE STUDY OF THE HOUSTON KATY FREEWAY, M A. Miller, J A. Misener, D N. Godbole, and A R. Deshpande
ACCESSIBILITY INDICES: PILOT STUDY AND POTENTIAL USE IN STRATEGIC PLANNING, J G. Schoon, M McDonald, and A Lee
Submissions from 1998
I-5 COLUMBIA RIVER BRIDGE TRUNNION REPAIR PROJECT TRAFFIC MANAGEMENT PLAN, W P. Ciz
REAL-TIME TRAFFIC SIGNAL OPTIMIZATION WITH TRANSIT PRIORITY: RECENT ADVANCES IN THE SIGNAL PRIORITY PROCEDURE FOR OPTIMIZATION IN REAL-TIME MODEL, M Conrad, F Dion, and S Yagar
AUTOMATIC VEHICLE LOCATION: IMPLEMENTATION, APPLICATION, AND BENEFITS IN THE UNITED KINGDOM, N HOUNSELL and F McLeod
DRIVERS' PERCEPTION SURVEY FOR TOLL LANES AND CAR POOLS, E Kwon and C Kelen
THE PROSPECT AND GOWANUS EXPRESSWAY CORRIDORS TRANSPORTATION SYSTEMS MANAGEMENT (TSM) PROJECT, R A. Maitino
Development of a public transport priority corridor in Central London, Stuckley M and Hanson P
MOTORIST BEHAVIOR AND OPINIONS TOWARD HIGH-OCCUPANCY VEHICLE LANES AT RAMP METERS, B R. Newman, S S. Washburn, and N L. Nihan
METHOD OF OBTAINING CONSUMER WELFARE FROM REGIONAL TRAVEL DEMAND MODELS, Caroline J. Rodier and Robert A. Johnston
Submissions from 1997
IMPROVING GRADE CROSSING SAFETY NEAR HIGHWAY INTERSECTIONS, W F. Bremer and L M. Ward
A SIMPLE PHYSICAL PRINCIPLE FOR THE SIMULATION OF FREEWAYS WITH SPECIAL LANES AND PRIORITY VEHICLES, Carlos F. Daganzo, Wei-Hua LIN, and Jose M. del Castillo
Submissions from 1996
MODELLING AND EVALUATION OF ADAPTIVE BUS-PREEMPTION CONTROL WITH AND WITHOUT AUTOMATIC VEHICLE LOCATION SYSTEMS, Gang-Len Chang, Meenakshy Vasudevan, and Chih Chiang Su
MODELING AND EVALUATION OF ADAPTIVE BUS-PREEMPTION CONTROL WITH AND WITHOUT AUTOMATIC VEHICLE LOCATION SYSTEMS, G-L Chang, M Vasudevan, and C-C Su
GARAGES: THE KEY TO A SUCCESSFUL TRANSPORTATION SYSTEM, G A. Finstad
THE EFFECTS OF NEW HIGH-OCCUPANCY VEHICLE LANES ON TRAVEL AND EMISSIONS, R A. Johnston and R Ceerla
ON THE RESERVE CAPACITIES OF PRIORITY JUNCTIONS AND ROUNDABOUTS, S C. Wong
Submissions from 1994
LIGHT RAIL AND BUS PRIORITY SYSTEMS: CHOICE OR BLIND COMMITTMENT?., David A. Hensher and WILLIAM G. WATERS
A PROCEDURE FOR REAL-TIME SIGNAL CONTROL THAT CONSIDERS TRANSIT INTERFERENCE AND PRIORITY, S Yagar and B HAN
Submissions from 1993
LIGHT RAIL TRANSIT GRADE SEPARATION GUIDELINES, Institute of Transportation Engineers
Submissions from 1991
QUEUE LENGTH AND WAITING-TIME DISTRIBUTIONS AT PRIORITY INTERSECTIONS, D Heidemann
DESIGN FEATURES OF HIGH-OCCUPANCY LANES: SUMMARY OF AN INFORMATIONAL REPORT, T J. Lomax
Submissions from 1988
THE EFFECTIVENESS OF HIGH OCCUPANCY VEHICLE FACILITIES. A SUMMARY REPORT, Institute of Transportation Engineers
THE VENTURA FREEWAY ADVISORY COMMITTEE: PUBLIC PARTICIPATION IN TRANSPORTATION PLANNING, J O. Voss
Submissions from 1987
IMPROVING TRANS-HUDSON BUS ACCESS TO MIDTOWN MANHATTAN, R Roberts and F S. Baer
IMPROVING TRANSIT THROUGH TRAFFIC MANAGEMENT, B T. Smith and M A. GALLAGHER
Submissions from 1986
FUEL CONSUMPTION ANALYSES FOR URBAN TRAFFIC MANAGEMENT, D P. Bowyer, R Akcelik, and D C. Biggs