Operation of Light Rail Transit through Ungated Crossings at Speeds over 35 MPH
Document Type
Report
Publication Date
2011
Subject Area
mode - tram/light rail, place - north america
Keywords
light rail, ungated crossings, micro-simulation modelling
Abstract
TCRP Web-Only Document 53 presents the findings and results of the investigation conducted in support of TCRP Project A-32, “Operation of Light Rail Transit through Ungated Crossings at Speeds over 35 MPH.” In addition, this report presents the findings of the micro-simulation modeling conducted as an alternative to an evaluation of the impacts of higher LRV speeds on selected locations in San Jose. The project panel agreed that the modeling was a feasible and valid alternative to a field test, necessitated by the City of San Jose’s decision to not participate in a field test. In addition, other municipalities/systems that were contacted to participate were not able to do so during the project schedule.
Rights
Permission to link to this report has been given by Transportation Research Board, Washington, copyright remains with them.
Recommended Citation
Golembiewski, G., Sabra, Z., Pecheux, K., & Boorse, J. (2011). Operation of Light Rail Transit through Ungated Crossings at Speeds over 35 MPH. Transit Cooperative Research Program (TCRP) Web-Only Document 53, published by Transportation Research Board, Washington